Experience
2-15-13
–
Current
Project People (Ericsson) Sprint and AT&T
Projects Houston TX
Responsibilities Included but not limited
to
·
Managed the
microwave construction on over 150 Sprint sites for the purpose of
providing fiber backhaul in instances where cost would not allow for
underground services
·
Scheduled
and managed the SP’s through MW construction and integration
·
Scheduled
and managed material availability and delivery to SP
·
Worked
closely with OPS in order to provide support during migration
·
Currently
overseeing 65MHz construction for over 200 sites
·
Schedule
and manage SP’s
·
Review and
adhere to market and project costs
·
Review
change order requests as they pertain to the project
·
Perform
preconstruction walks with SP’s and LL
·
Manage Site
Handler and Construction Activity Manager data bases
·
Perform
Safety and Quality Audit Walks
·
Manage all
construction milestones and COP’s
·
Review CD’s
and Redlined CD’s
·
Continue to
perform all responsibilities mentioned in previous work experience
·
AT&T 2nd 3rd and 4th carrier
adds
·
Perform
preconstruction walks with vendor to determine SOW, power/fiber
availability, also to verify that the structurals matched the current site
configuration
·
Reviewed
vendors OOM’s to confirm that the MD298 drivers matched the site specific
SOW
·
Managed all
phases of construction from fiber/power trunk installation, antennal swap
out or installations, conventional and power only squid installation,
power, fiber and alarming within the shelter or outdoor configs.
·
Managed the
delivery and reviewed COP’s that were based off MD298 drivers/SOW
Experience
03/2012 – 10-24-12 DSPi
Houston TX
Director of Construction
Responsibilities Included but not limited
to
·
Established
in house construction team and managed turnkey projects from financial,
custructability and quality standpoint
·
Deployed 4G
technology for Verizon in Midland/Odessa, Amarillo and SW Louisiana markets
which consisted of many types of applications. From new antennas and lines
to utilizing existing coax and triplexing or diplexing existing PCS and
Cellular technologies
·
Performed
sweep testing with Anritsu E model and scheduled all PIM testing
·
Personally
provided field training of new employees in telecommunication installation
on both ground and tower applications
·
Managed all
job costs
·
Material
Procurement
·
Heavily
utilized excel for construction schedules and job projections
·
Continued
to utilize skills and responsibilities listed below in past experience.
Experience
08/2011-02-21-2012
Trusty
Construction
Houston TX
Regional Branch Manager
Responsibilities Included
·
Providing
turnkey construction services to all customers in my assigned region
·
Attended
bid walks and provided timely estimates for all major carriers in Houston
and surrounding areas
·
Managed all
in house and subcontracted construction services which included civil,
tower and electrical
·
Responsible
for managing market and job profit and loss
·
Receipt of
PO’s from customers and worked closely with CFO during invoicing processes
·
Customer
and Subcontractor Relations
·
Worked
closely with Safety Director (based in Dallas corporate office) and
implemented/managed all procedures with my respective employees.
Reviewed JSA’s and discussed safety scenarios with my crews on a daily
basis.
·
Conducted
all interviews for new hires and worked closely with HR department during
dismissal procedures
·
Provided
timely delivery of all closeout documentation to customers
Experience
09/2010-6-20-20011
Huawei Technologies Inc
Plano TX
Implementation/Construction Manager
Responsibilities included
·
Developing
turnkey construction presence in North America for this Chinese operated
company
·
Assisted
in developing Market costs through construction drivers, bidding processes,
and Turnkey Vendor Qualifications
·
Prepared
power point presentation designed to lay out construction processes from,
site acquisition interface, RF and Microwave input to design, site
development and deployment, quality control and handover.
·
Work with sales team while
reviewing customer RFQ’s and provide market cost assumptions (deployments
of 500+ sites)
·
Work hand in hand with Site
Acquisitions team from scrubbing search rings, feasibility walks, A&E
walks, Design and Review meetings, and through NTP release.
·
Visited
10% of sites in a 600 site build in Las Vegas and San Diego markets for Cox
Communications. Provided construction cost analysis for both markets.
·
Laredo
Market Construction Manager for Cricket Project (duties are as follows)
·
Managed
and performed cutover of jumpers and T1’s during maintenance window
·
Managed
removal of Nortel equipment and placement of Huawei equipment
·
Managed
installation of DSX’s and connectivity from new Huawei equipment back to
the Huawei built BSC and Core
Experience
07/2009-
08/2010
Clearwire
Houston TX
Implementation Manager/WIMAX Market
Launch
Responsibilities included
·
Worked with
site acquisitions, RF and Microwave teams to develop market launch strategies
and schedules
·
Performed
feasibility/constructability walks to help determine and monitor market
costs
·
Performed
A&E design and review meetings to assure CD’s were accurate prior to
submittal for permitting
·
Performed
bid walks with turnkey vendors and scrubbed bids to assure accurate
scheduling and cost management
·
Provided
build schedule and conducted daily deployment meetings to assure on time
delivery of sites to NET OPS for optimization/integration
·
Completed
Dragonwave training and played an intimate role in Microwave backhaul
design while working with the engineering staff.
·
Scheduled
LOS procedures and path alignment .
·
Successfully
and on time launched the Clearwire Wimax network in Houston TX which
consisted of 600+ sites
Experience
08/2008-
05/2009
IAS Claim Services
Houston TX
Catastrophe Insurance Adjuster
Responsibilities included
·
Served as
an independent contractor on an emergency CAT Crew
·
Provided
estimates and successfully closed over 200 insurance claims for 8 different
insurance companies.
·
Provided
detailed measurements and drawings of roof and home structures while
writing estimates utilizing a virtual estimating program. Wrote
accurate estimates of damages in excess of $200,000.00
·
Provided accurate scheduling for the Insurance and
Adjusting firm while maintaining on time delivery of services to the home
owners.
·
With a high
success rate I was one of 3 adjusters to be invited to stay on as a part
of the clean up crew. With this task it was my responsibility
to reschedule visits with homeowners. This was due to the original
adjuster missing or poorly estimating damages suffered to the home.
Experience
02/2005-
08/2008
Metro PCS
Dallas TX, Los Angeles CA, Shreveport
LA
Project Manager
Responsibilities included
·
Market
launch deployment strategies
·
Implementation
and site design
·
Provided
deployment scheduling and forecasting for successful launch of the network
·
Managed
market costs through feasibility and constructability walks with Site
Acquisitions team, and through vendor qualification
·
Performed
A&E walks and performed design and review meetings in order to have
100% CD’s procured and approved by LL.
·
Worked with
RF engineers in order to assure effective and operational design
·
Conducted
weekly deployment calls with GC’s to assure accurate dates and delivery of
construction milestones.
·
Managed
telco design walks and delivery of circuits for backhaul
·
Managed
quality assurance and handover to NET OPS
·
Successfully
met soft launch of 500+ sites in Dallas TX and achieved network rollout of
700 sites
·
Deployed to
Los Angeles California for launch and network rollout of 1500 sites while
following same responsibilities mentioned above
·
Was invited
back to Dallas market and managed all network growth construction while
also launching a 300 site build in Shreveport LA. Same duties and
responsibilities mentioned above were required.
·
Utilized
Siterra as market management tool to track construction and milestone
deliveries
Experience
10/2002-02/2005
Chapman Construction
Dallas/Houston TX
Construction Supervisor/Project Manager
Responsibilities included
·
Managed all
construction crews responsible for deployment of telecommunication sites
(all technologies) for all carriers in Dallas and surrounding areas.
This also included the UMTS rollout for Cingular in Houston TX
·
Conducted
bid walks and provided estimates and market costs to all major carriers in
the markets mentioned above.
·
Managed all
reclosures on high voltage towers
·
Procured
material and delivery.
·
Provided
daily market scheduling for successful deployment and handover to
carriers/net ops
·
Provided and delivered all closeout documents
Experience
08/2001-
10/2002
American Tower
Dallas TX
Project Manager
Responsibilities included
·
Managed the
build and deployment of the AT&T fixed wireless network
·
Conducted
A&E walks and assisted in site design
·
Conducted
CD design and review meetings
·
Conducted
bid walks and provided estimates
·
Managed all
construction schedules and deployment calls
· Managed quality control and handover to customer
Experience
04/2000-
08/2001
Airtel Communincations
Dallas TX
Operations Manager
Responsibilities included
·
Managed all
turnkey construction services.
·
Managed
turnkey deployment strategies and rollout in Dallas for Nextel, Sprint PCS,
Voice Stream, Verizon, and Airband.
·
Managed
turnkey deployment strategies and rollout in Oklahoma for Nextel, Sprint
PCS, and Voice Stream
·
Managed
turnkey deployment strategies and rollout in Louisiana for Telecorp
·
Managed
turnkey deployment strategies and rollout in Iowa for Telecorp
·
Managed
turnkey deployment strategies and rollout in Colorado for Cricket
·
Managed
turnkey deployment strategies and rollout in Florida for Spectrasite and
Nokia
·
Provided
market cost analysis and deployment processes and procedures
·
Provided
market schedules and conducted deployment calls to assure successful
handover to the customer
·
Conducted
bid walks and wrote estimates while managing profit margins
·
When needed
provided sweep tests in the field utilizing HP spec analyzer and Wiltron
Site Master
·
Reviewed
all sweep data and close out packages
·
Managed all quality control
Experience
03/1999-
04/2000
WesTower
Denton TX
Regional RF and Civil Construction
Manager
Responsibilities included
·
Supported
all construction operations for all the major carriers in the DFW and
surrounding areas
·
Conducted
bid walks and provided estimates for all turnkey deployment projects.
·
Managed 4
RF crews and 3 civil crews
·
Conducted tower safety work procedures.
·
Assisted
market director in managing job costs so as to meet set profit margins.
·
Interviewed
and hired select individuals and conducted proper RF and civil construction
installation training.
·
Continued
to personally erect all types of communications structures and RF
installation finish out as to help train new employees.
·
Comprised
site material lists and managed procurement and delivery
Experience
07/1995-
03/1999
Able
Integrated Systems/Comsat
McKinney TX
Tower Technician
Responsibilities included
·
Constructed
and erected over 200 guy, SST, monopole and stealthed communication
towers. Manufacturers such as Rohn, Stellar, FWT, Fiber Bond,
Sabre….etc;
·
Performed
plumb and tension, and guy wire change outs
·
Became
highly skilled in cellular, PCS and microwave installations.
·
Conducted
LOS surveys and path alignment for MW hops ranging from 2GHZ to 18GHZ
·
Performed
sweep tests for all major carriers
·
Was
promoted to RF foreman after 1 yr of service
·
Led my team
in the decommissioning of a MW system throughout the state of Missouri for
the FBI after passing security clearance
·
Led 4 crews in a retrofit project for Nokia in Seattle
and surrounding areas. This consisted of full connector, and MHA
change outs, pre and post sweep testing. Was in charge of market
scheduling and reviewing all sweep data prior to submittal to customer.
·
Was trained
in site surveying and civil construction which consisted of shelter
foundation installation, tower pier installation, ground ring installation
and testing, H-Frame installation and installation of electrical and telco
conduits.
Experience
11/1991-
1995
United States Marine Corps
Camp Pendleton CA
Corporal/Squad leader and Gunner of 81MM
Mortar Crew
Responsibilities included
·
Meritoriously
promoted out of basic training.
·
Ranked in
the top 3% of my graduating class out of basic training. This was
based on academic, physical fitness, and rifle range achievements.
·
Served as 4th squad
leader throughout basic training and led 30+ men. It was my duty to
teach and motivate the young men that were falling behind during marine
recruit training and I was judged solely on my ability to adapt and lead my
squad.
·
Graduated school of infantry once again as 4th squad
leader and was meritoriously promoted to LCPL after achieving personal and
squad goals at the highest level.
·
Deployed to
3rd Battalion 1st Marine Division where I was made squad leader of my
81MM mortar gun crew after 1.5 yrs of service within the battalion.
Led my team in successful insertion and extraction maneuvers and mastered
day and night land navigation.
·
Served as a
part of the 31st Marine Expeditionary Unit overseas. Was stationed
in Okinawa Japan for 9 months from which we deployed to sea and patrolled
the Asian waters.
Actively seeking PMP
certification
References